Project Details
UNT's new Interdisciplinary Research Building has just completed. Lantek installed an entirely 6A Commscope Systimax solution. Over 600,000 feet of cable installed to 3700 jacks. In the comm room we used the Systimax 360 modular loaded patch panels with CPI ladder racks and two post frames. the stacked comm rooms are connected with OM4 and OS2 fiber as well as a multipair copper.